NEW DUNEDIN HOSPITAL INPATIENT BUILDING
CLIENT: CPB Contractors
SECTOR: Health Care
SERVICES: ECI Digital Engineering Lead
SIZE: 89,000 m2
STATUS: Ongoing
NDH Inpatient Building
BuildBIM was the lead digital engineer during ECI on the NDH Inpatient Building.
Our role was to represent our client, CPB Contractors, during the design phase of the project, assisting to develop the digital engineering strategy for the project and during the construction phase in particular. This included the development of project BIM objectives, a BIM data management plan, BIM modelling standards, and risk mitigation strategies for BIM.
At a project $1.58 billion cost, the NDH Inpatient Building will have 410 inpatient beds in total and feature a 53 bed Emergency Department, an Operating Theatre Suite, a Short Stay Surgical Unit, Intensive Care Unit, Neonatal Intensive Care Unit, and a dedicated Primary Birthing Unit.